What to record each shift on a load and haul job

A shift record has to answer two questions later: what did we move, and why was it less than planned.

The checklist

Who and what

  • Date and shift, day or night.
  • Each operator and the machine they were on.
  • Start and finish times.

What moved

  • Loads for each machine.
  • Tonnes for each load, and where the figure came from.
  • Material for each load.
  • Source and destination for each load.

What got in the way

  • Breaks, and whether they were at the planned times.
  • Delays and standdowns, with the reason.
  • Weather.
  • Operator comments.

Sign-off

  • Corrections the supervisor made, and why.
  • The supervisor's sign-off.

Why each part matters

Source and destination are what turn a load count into a claim. Without them you know how much moved and not which job it belongs to.

Delays and weather explain a short shift on the day, when people still remember. A week later they are a guess.

Sign-off means one person has looked at the shift and agreed it is right before it goes to accounts.

Keep it in one place

The record is only useful if it is all together. Loads on a docket, delays in a diary and weather in a text message is three records, and nobody joins them up.

How Eaglite does it

Eaglite's shift review holds all of this for each shift: every cycle with its material and tonnes, the operator's comments, breaks and flags, and the start and end of shift metrics such as weather. The supervisor can edit an event and signs the shift off. See the shift review.