Fourteen days live on one project. Four answers on day fourteen, without a spreadsheet.

See how the fourteen days work

Solutions

Load and haul, earthworks and digital dockets.

One product for load and haul, bulk earthworks and the shift record that replaces a paper docket.

Built for mining and civil contractors who need the count on the day, including sites with patchy or no coverage.

Inside a haul truck cab on a red-dirt site with the Eaglite tablet mounted beside the wheel.

The core record

One record for every load.

The operator records the work once in the cab. The same record is ready for shift review, progress and the claim.

The load

Tonnes, material, load time, dump time, breaks, delays and comments.

The place

The named source and destination areas from the project map.

The people and plant

The operator, machine and shift tied to the work that happened.

Where it is used

The same record, applied to the work.

Load and haul

Know the count during the shift.

Replace radio calls and end-of-shift tally sheets with a record created when the load happens.

Same-day totals

Loads and tonnes by material, operator, vehicle, source and destination.

Cycle and delay context

Loads per hour, cycle times, breaks, delays and operator comments.

Bulk earthworks

Count progress against the plan.

Connect the load record to stages, work orders, site areas, design linework and survey history.

Targets and volume

Convert tonnes to cubic metres using material density and compaction factors.

The work on the ground

Use DXF linework, named geofences and dated drone imagery on the map.

Digital dockets

Record once. Review without retyping.

Replace the paper load docket with a tablet record that the supervisor can check and sign off.

Less writing in the cab

Pick a name, tap Load and Dump, enter tonnes and add a comment when needed.

Ready in the office

Review the shift on screen and export a file when accounts needs one.

Industry fit

Built for mining and civil contractors.

Mining and rehabilitation

Keep recording on remote sites with no bars, sync through a machine connection or later, and keep Eaglite off the mine’s network.

Civil earthworks

Track cut-to-fill, cart-away, subdivisions and road work against work orders, volumes and site drawings.

Where it fits

Focused on counting the work.

Eaglite is for contractors who need more than paper or a spreadsheet.

Compare the options

Questions about where Eaglite fits

What is load and haul tracking?

Load and haul tracking is a record of every load a fleet moves: which machine and operator, what material, how many tonnes, where it was loaded and where it was dumped. It gives the office a load count and tonnes moved for each shift without adding up paper dockets.

What is a digital docket?

A digital docket is the load record a paper docket holds, entered on a device where the work happens: the load, the tonnes, the material, the source, the destination, the operator and the time. It reaches the office without being collected or retyped.

Does Eaglite work without mobile coverage?

Yes. The tablet keeps recording without a link and syncs when the link is back. For a live count in the office, each machine can carry a Starlink, or you can use your own Starlink or SIM.

Can Eaglite convert tonnes to cubic metres?

Yes. You enter a density for each material. Tonnes typed in the cab are converted to cubic metres for work orders, and cubic metre targets are converted back to an estimate of loads remaining.

Show us one project.

We will map Eaglite to the work and tell you straight whether it fits.

Not sure yet? Start with a 14-day pilot

The price is from $19 a day per machine, ex GST.